The requested picture after Spectrum came back out. They moved the box down, ran the conduit through the knockout, and put in a shorter cable so there wasn’t 50’ rolled up in there. They still need to bury the line so that’s why the main cable isn’t protected yet. Thanks to those who commented/helped on my last post.
They put the right connector on there too, looks good